Monday, January 19, 2009

Fuselage Formers

Tonight the fuselage side formers were fixed in place. No major dramas here.



Sunday, January 18, 2009

The coming together of the fuselage

Little by little, work has been ongoing on the fuselage of this model. Measuring just over 64" when finished, and building it in a room 2m x 2.6m is keeping life interesting. The two side trusses have been built, key formers in place and tonight the main section of the fuselage was tied together. So far, so good. At this point, it has been decided that we are going to use the build instructions as a 'guide' but push ahead on the construction (otherwise having to wait for the retracts to arrive). Photos below showing everything aligned and glued with 30minute epoxy for strength.






Thursday, January 15, 2009

Decisions, Decisions...

The weekend saw a review of the project, some research (from the various books I've collected over the years on the C-130) and a number of important decisions being made as follows:
1. Retract system will now be air not mechanical. - purchase made and goods on the way
2. The Weatonic dual receiver fits so will form the 'heart' of bird - a 36MHz model has been sourced and is on its way
3. The plane will definately be based on A97-001 of the RAAF and will be painted as per its time in the 36th Sqd. This particular aircraft has won competitions (airlift) and has now seen in excess of 20,000 flying hours.
4. A full lighting system will be installed including navigation, formation and landing lights as applied to the particular aircraft being modelled.
As such, photos of the particular aircraft are being collected (so if you happen to have any - let me know) and specific details are being sought from individuals who know this aircraft intimately.

Saturday, January 10, 2009

Build-Restarted

Well... after a false start with the first side truss we have dicovered that it isn't the cutting of the parts that's wrong - its the plans. Somehow they have shrunk in the vertical dimension only. So, to cut a long story short, the plan of attack is now to build based on the parts cut using the plans for guidance in the horizontal direction only. Closer examination of the plans has also revealed that some components have not been cut correctly (and will therefore have to be replicated by hand here) and that while the instructions refer to modifying a set of Robart retracts for the main landing gear, that the plans fail to show the relevant details and indicate a set of "Goldberg" retracts are to be used. All in all - this is going to keep getting interesting. Anyhow, construction is underway. Photos below showing the first truss 'setting' and the 'box of bits' from the kit cutters.

Friday, January 9, 2009

Introduction

Welcome to the project site of the 1/18 Scale, Palmer Plans, C-130 Build. This C-130 Hercules radio control plane design was provided by (the late) Dan Palmer. This site will cover the various stages of construction and hopefully flights thereafter of this radio control model. The intention of the site is to give others looking to build this plan some insight into the difficulties and how they were overcome as well as being somewhere were people can generally follow the progress of this project. Many decisions on the build are still yet to be taken and will be subject to numerous changes as the build progresses however initial plans and thoughts are as follows:

1. Powerplant will by 4 x OS FS30s in leiu of the original OS Max 25FPs.
2. The model will be based on / replica of A91-001 of the Royal Australian Air Fore.
3. The model will be a C-130H as per the original plans.
4. The original mechanical retracts may be replaced with Air-retract system.
5. Receiver considerations are centering around the Weatronic 12-20R Dual Receiver (36MHz) with a view to going to 2.4GHz in the future.
6. On-board navigation lighting system in being considered.

The plans were originally purchased from Dan Palmer a number of years ago however they are currently in storage in Australia. A replacement set of plans and a full wood kit was purchased from Precision Cut Kits in U.S.A. and shipped to Dubai, United Arab Emirates for construction.

Construction began on the evening of 9 January 2009 with the box being unpacked, the instructions read and the first attempt at the fuselage frame being made. It was then that it was discovered that the pre-cut former piece are all slightly (but enough) larger that the plane can not be built using a direct 'lay-over' technique. Result = One side of the truss frame abandoned and to be reconstructed.